HILTON THE PALM

Products used

Aquatherm Green Pipe System

Location / date

Palm Jumeirah/2014

Hilton The Palm, this project is located on one of the most admired master developments in the whole world – Palm Jumeirah, B+G+13+R Resort Hotel on the Plot PJTRH02 is designed as 5-star branded hotels, with an approximate 100,000 sqm Built-up Area of each, it consists of 592 standard rooms, 57 two-bay and three-bay suites and presidential suite. CSCEC ME will execute Civil Works, Finishes, MEP and External Works within 940 days (including 30 days Mobilisation Period).

COMPANIES ASSOCIATED WITH HILTON THE PALM

Advantages of Aquatherm Green Pipes

Tough Challenges

The real Challenges that were faced and raised by the MEP contractors in front of the Project Manager from Al Sahoo trading company was about the tight schedule and price hike that affected the cost. They were strict with their quality assurance and long-lasting alternatives.

Quick and Smooth Solution

Al Sahoo Trading company has been serving the GCC region with High-quality global brands to provide the best MEP solutions for our clients. Our team has the ready-made solutions with PPR pipes (Polypropylene) for the China State Construction Engineering Corporation, we have suggested to them our aquatherm green pipe made in Germany as a solution. The statements and the submittals are well considered and accepted by the consultants and the engineers. The pace of the MEP initiatives for the project works was highly accelerated by the ease of the installation and timely delivery of the product as per the requirements from our clients. We have distributed around 255260 aquatherm PPR products for the projects including the pipes and the fittings. aquatherm green pipe requirement for the project was around 92216 meters. As we have promised to the China State Construction Engineering Corporation, we provided them with a cost-effective and long-lasting alternative MEP solution through the time-to-time supply of the materials. And we also ensured the manufacturer support from the team aquatherm Germany at the time of installation.

Successful and Satisfied Project

The Pipe system installation proceeded very smoothly, according to the CSCME. “It’s easy to work with aquatherm PPR pipes, it’s lightweight, and there’s no welding on-site,” also added. “And Aquatherm’s 10+ year warranty is something a contractor or a building owner definitely doesn’t get with a steel pipe.” Since the project started, CSCME never ever thinks about the challenges that they have raised about the piping system of the initial phase. Al Sahoo Trading company and aquatherm PPR pipe signed the next project with team China State Construction Engineering Corporation.

Advantages of Aquatherm Green Pipes

The practices like heat-fusion welding techniques applicable for the aquatherm PPR pipes allowed the MEP contractor to fuse the piping system quickly, helping to reduce the project time. The features of Aquatherm like lightweight & simple heat-fusion process, the MEP contractor’s projected labour costs came in under budget. Time to Time Delivery: Since Al Sahoo is the exclusive partner of Aquatherm Germany for the GCC regions. We can assure the material availability. We managed stock of all the sizes till 160 MM and our team regularly checked with the CSCME about requirements on the higher size materials to get ordered from Germany and supply at times when they really needed.