Projects

Overview

image

Projects

THE ROYAL ATLANTIS: AN ICONIC

Products used

Aquatherm Green Pipe System & PPR Pipe Fittings

Location / date

Palm Jumeirah/2018

The Royal Atlantis modernizes on archetypal high-rise hotel & residential 43 storey resort design by consisting of extensive areas of true open space into all areas of the tower. The Royal Atlantis is adjacent to the existing Atlantis on the crescent of the Palm.

However, appearance as a singularly united structure, the Atlantis is really two buildings flawlessly connected – with the hotel tower to the west & residential tower to the east – linked by a strong arch crossed by a connecting bridge. Apartments and Hotel rooms are ordered as a series of distinct segmental blocks.

COMPANIES ASSOCIATED WITH THE ROYAL ATLANTIS

Advantages of Aquatherm Green Pipes

Tough Challenges

The Royal Atlantis is a 600-meter-long, 178-meter-tall megastructure, operating as a permeable screen, porous to people, light and air. Water supply infrastructure for the iconic building was a huge concern for the MEP consultants and contractors. Particularly the hot water network. The centralized heating system feeding this megastructure required a constant operation of high-water temperatures throughout the network, therefore extra attention had to be taken into selecting the correct piping series for that application. SPECON the MEP contracting firm was seeking a piping material for The Royal Atlantis the iconic singular united structure that would stand up well to the area’s aggressive water. The amount of pressure that will be needed at the base of the domestic water riser is one of the major concerns within the designs. Excessive pressure causes operational difficulties and the cost of maintenance was the other concern in front of the MEP consultant.

Quick and Smooth Solution

Quick and Smooth Solution Successfully and with the aid of our planning department at Aquatherm Germany Al Sahoo and the team have put forward the best solution to SPECON for the iconic project. We have carefully reviewed all the project drawings & specifications and have proposed the appropriate Aquatherm Green pipes piping system to meet the project's requirements and the approval of the project's consultant. The technical detailing and the expert’s explanation directly from the aquatherm Germany supported by the global standard approvals made Al Sahoo Trading to be the MEP Partner for the Royal Atlantis Project. Short-time delivery with extensive technical support from our experts on the ground and product installation training, Al Sahoo highly accelerated the pace of the MEP initiatives for this iconic Project. We have delivered more than 185,712 articles of aquatherm PPR pipes and pipe fittings for the project since 2018. As of now around 93,123 meters of aquatherm Green Pipe SDR7.4 MF in the different size range.

Successful and Satisfied Project

The Pipe system installation proceeded very smoothly, according to the CSCME. “It’s easy to work with aquatherm PPR pipes, it’s lightweight, and there’s no welding on-site,” also added. “And Aquatherm’s 10+ year warranty is something a contractor or a building owner definitely doesn’t get with a steel pipe.” Since the project started, CSCME never ever thinks about the challenges that they have raised about the piping system of the initial phase. Al Sahoo Trading company and aquatherm PPR pipe signed the next project with team China State Construction Engineering Corporation.

Advantages of Aquatherm Green Pipes

The practices like heat-fusion welding techniques applicable for the aquatherm PPR pipes allowed the MEP contractor to fuse the piping system quickly, helping to reduce the project time. The features of Aquatherm like lightweight & simple heat-fusion process, the MEP contractor’s projected labor costs came in under budget. Time to Time Delivery: Since Al Sahoo is the exclusive partner of Aquatherm Germany for the GCC regions. We can assure the material availability. We managed stock of all the sizes till 160 MM and our team regularly checked with the CSCME about requirements on the higher size materials to get ordered from Germany and supply at times when they really needed.

Similar Projects